Purge incomplete instructions older than a configurable duration

XMLWordPrintable

    • Type: New Feature
    • Resolution: Fixed
    • Priority: Major
    • Component/s: SolarJobs
    • None

      Currently SolarNet has a job to purge completed instructions older than a specific duration, however sometimes a node might leave instructions in an incomplete state forever (i.e. it has abandoned the instruction). SolarNet should purge these incomplete instructions, using a configurable duration that is fairly long (e.g. 4 months).

            Assignee:
            Matt Magoffin
            Reporter:
            Matt Magoffin
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

              Created:
              Updated:
              Resolved: